Phases 2-4 Design: January 2023 to December 2025

Design for Phases 2 through 4 is currently underway. Phases 2 through 4 will extend the 12th Street storm drain system along 12th Street from 2nd Avenue to 8th Avenue. Storm drain systems are built beginning with the “downstream” end, the outfall at the river, and moving “upstream,” increasing the system’s capacity to capture stormwater in phases. The storm drainage system will reduce flooding in the area while providing a discharge location for future storm drains further “upstream.”

The project will also reconfigure the existing roadway section along 12th Street from 2nd Avenue to 8th Avenue. Additionally, the improvements will provide stormwater quality before the stormwater discharges into the Poudre River.

Share Phases 2-4 Design: January 2023 to December 2025 on Facebook Share Phases 2-4 Design: January 2023 to December 2025 on Twitter Share Phases 2-4 Design: January 2023 to December 2025 on Linkedin Email Phases 2-4 Design: January 2023 to December 2025 link
<span class="translation_missing" title="translation missing: en-US.projects.blog_posts.show.load_comment_text">Load Comment Text</span>