Poudre River Trail at Sheep Draw Natural Area: Reroute and Trailhead Design
Greeley Natural Areas & Trails (NAT) has hired Otak, a regional engineering and design firm, to complete an 80% design for a reroute of the Poudre River Trail within Sheep Draw Natural Area and a new trailhead. The trailhead will be on the west side of 59th Avenue, about one-third of a mile north of F Street.
The project includes design, engineering, and construction plans to reroute approximately 600 feet of the Poudre River Trail to help protect it from erosion as the river naturally moves within its floodplain. This section of trail will move farther from the river to a more sustainable location.
The new trailhead will improve public access by providing connections to the regional Poudre River Trail, the Sheep Draw Trail, and the nature trail within Sheep Draw Natural Area.
This phase will produce design documents and construction plans developed to the 80% stage. These plans will help the City estimate costs and prepare for construction bids. The work also includes any required permits and environmental reviews, such as a floodplain development permit and a study to identify wetland boundaries.
Construction will take place in a later phase when funding is available.
Why is this project needed?
Protecting the Trail
The existing Poudre River Trail is threatened by erosion as the river naturally moves within its floodplain. When this section of trail was built in 2005, the river was about 65 feet from the trail’s edge. By 2024, it was less than 5 feet away. The river has shifted enough that its left bank is now where its right bank was in 2005.
This section of the concrete trail is currently closed due to erosion. Trail users should follow the designated soft-surface trail to detour around the closed area.
Continued erosion, high spring flows, or a major flood could damage the trail and break this connection for trail users. Rerouting the trail will help address the current erosion risk and move it to a more sustainable and resilient location.
Improving Trail Access
As trail use grows, the need for another trailhead is becoming more urgent. The nearest Poudre River Trail access points are Rover Run, about one mile east, and Signature Bluffs, more than one mile west. Site constraints prevent these facilities from expanding.
These trailheads are often full during busy times. This can lead to illegal and unsafe parking along road shoulders or cause people to leave without enjoying the trails. The closest trailhead on the Sheep Draw Trail is at McCloskey Natural Area, about 2.5 miles from the project site.
Trail use has increased significantly since nearby trailheads were built in 2004 and 2007. Recent trail counter data near the project area show nearly 40,000 uses each year. During the five busiest months, May through September, the monthly average is close to 5,000. The existing nearby trailheads have a combined 84 parking spaces.
A new trailhead will add parking in a growing residential area and shorten the distance people travel to reach the trails. It will also make it easier to explore the nature trail within Sheep Draw Natural Area.
Together, these improvements will improve access to the Sheep Draw Trail, which connects to the Family FunPlex, and the regional Poudre River Trail, which connects Greeley with Windsor and Fort Collins.
Project Timeline
Greeley Natural Areas & Trails received a $45,000 grant from the State Trails program for this design project. This funding allows planning and design to move forward now.
Planning began in September 2026 and is expected to take about 11 months. The process includes community and stakeholder input, as well as reviews by City staff and other agencies. The 80% design is expected to be completed in July 2027.
Preparing construction plans in advance helps the City estimate costs and consider the project in its Capital Improvement schedule. Staff can also use the plans to apply for construction grants.
Construction will happen in a later phase when funding is available. Because continued riverbank erosion could damage the existing trail within a few years, construction will likely happen in phases. The first phase would realign the trail, and the second would add the new trailhead.