Downtown Infrastructure
Greeley is investing in a stronger, more vibrant future for all of us.
We’re modernizing the essential infrastructure that keeps our community running—today and for generations to come. The Downtown Greeley Revitalization Infrastructure Project covers nearly 20 blocks with upgrades to water lines, sanitary sewer, stormwater, roads, sidewalks, and streetscapes. Construction begins in Summer 2026 and will be completed in phases.
Starting in our historic downtown core allows us to tackle the oldest and most critical parts of our underground systems first. These improvements will deliver reliable services, better flood protection, safer streets, and a more walkable, welcoming downtown that supports local businesses and community events for years ahead.
Stormwater Improvements
- New, larger stormwater infrastructure
- New stormwater inlets with more capacity at key intersections
- Significantly increased drainage capacity
Water & Sewer Improvements
- Replacement of aging pipes (some over 100 years old)
- More reliable water and sewer service
Roadway Improvements
- Smoother, longer-lasting pavement
- Enhanced intersections for safer driving
Streetscape & Mobility Improvements
- Upgraded sidewalks and accessibility features
- Beautiful streetscape enhancements
- Better connections for walking and biking
Building the Foundation for Downtown Revitalization
What to Expect During Construction
We’re committed to keeping disruptions as minimal as possible:
- Downtown stays open — businesses will remain accessible
- Pedestrian and traffic access will be maintained
- All scheduled downtown events will continue as planned
- Construction will occur in phases
- Temporary traffic changes, parking adjustments, and detours will happen at times
We’ll keep you informed with regular updates, schedules, and detour maps right here on this page.
This is more than infrastructure work—it’s an investment in a safer, stronger, and more vibrant Greeley that we can all be proud of. Thank you for your patience and support as we build a better downtown together!
Greeley is investing in a stronger, more vibrant future for all of us.
We’re modernizing the essential infrastructure that keeps our community running—today and for generations to come. The Downtown Greeley Revitalization Infrastructure Project covers nearly 20 blocks with upgrades to water lines, sanitary sewer, stormwater, roads, sidewalks, and streetscapes. Construction begins in Summer 2026 and will be completed in phases.
Starting in our historic downtown core allows us to tackle the oldest and most critical parts of our underground systems first. These improvements will deliver reliable services, better flood protection, safer streets, and a more walkable, welcoming downtown that supports local businesses and community events for years ahead.
Stormwater Improvements
- New, larger stormwater infrastructure
- New stormwater inlets with more capacity at key intersections
- Significantly increased drainage capacity
Water & Sewer Improvements
- Replacement of aging pipes (some over 100 years old)
- More reliable water and sewer service
Roadway Improvements
- Smoother, longer-lasting pavement
- Enhanced intersections for safer driving
Streetscape & Mobility Improvements
- Upgraded sidewalks and accessibility features
- Beautiful streetscape enhancements
- Better connections for walking and biking
Building the Foundation for Downtown Revitalization
What to Expect During Construction
We’re committed to keeping disruptions as minimal as possible:
- Downtown stays open — businesses will remain accessible
- Pedestrian and traffic access will be maintained
- All scheduled downtown events will continue as planned
- Construction will occur in phases
- Temporary traffic changes, parking adjustments, and detours will happen at times
We’ll keep you informed with regular updates, schedules, and detour maps right here on this page.
This is more than infrastructure work—it’s an investment in a safer, stronger, and more vibrant Greeley that we can all be proud of. Thank you for your patience and support as we build a better downtown together!
-
Stormwater Construction Set to Begin on 9th Avenue
Share Stormwater Construction Set to Begin on 9th Avenue on Facebook Share Stormwater Construction Set to Begin on 9th Avenue on X (formerly Twitter) Share Stormwater Construction Set to Begin on 9th Avenue on Linkedin Email Stormwater Construction Set to Begin on 9th Avenue linkDo you live or travel near 9th Avenue and 12th Street?
As soon as Monday, September 21, the block of 9th Avenue between 11th and 12th streets will close for several months while crews install new stormwater infrastructure.
Have Concerns?
If you live or regularly travel in the area, we want to hear from you. Let the project team know about regular deliveries, property access needs, scheduled services or other concerns we should be aware of during the closure by emailing InfrastructureComms@thelevel5.com.
What is Being Done?
The work area is tight, and the stormwater structures are too large to install as pre-cast pieces. Instead, crews will build the structures on-site. This construction approach will create more durable structures that provide a long-term solution for downtown infrastructure needs.
Building the system in place will also help reduce project costs. Once complete, the project will help reduce downtown flooding and support future development by improving the City’s water, sewer, and stormwater infrastructure.
For details on other road closures, go to https://greeleyco.gov/news/2026/20260916-street-closures-planned-along-9th-avenue-near-st-peters-catholic-church/
Do you live or travel near 9th Avenue and 12th Street?
As soon as Monday, September 21, the block of 9th Avenue between 11th and 12th streets will close for several months while crews install new stormwater infrastructure.
Have Concerns?
If you live or regularly travel in the area, we want to hear from you. Let the project team know about regular deliveries, property access needs, scheduled services or other concerns we should be aware of during the closure by emailing InfrastructureComms@thelevel5.com.
What is Being Done?
The work area is tight, and the stormwater structures are too large to install as pre-cast pieces. Instead, crews will build the structures on-site. This construction approach will create more durable structures that provide a long-term solution for downtown infrastructure needs.
Building the system in place will also help reduce project costs. Once complete, the project will help reduce downtown flooding and support future development by improving the City’s water, sewer, and stormwater infrastructure.
For details on other road closures, go to https://greeleyco.gov/news/2026/20260916-street-closures-planned-along-9th-avenue-near-st-peters-catholic-church/
-
Open House Set for Sept. 24, 2026
Share Open House Set for Sept. 24, 2026 on Facebook Share Open House Set for Sept. 24, 2026 on X (formerly Twitter) Share Open House Set for Sept. 24, 2026 on Linkedin Email Open House Set for Sept. 24, 2026 linkMajor infras
tructure improvements are underway, and we want to keep you informed about what’s happening now and what’s coming next. Join the City of Greeley for a Downtown Revitalization Project Open House to learn more about the Downtown Infrastructure Improvements and 12th Street Storm Drain Outfall Project.📅 Thursday, Sept. 24
⏰ 5:30-7 p.m. | Brief presentation at 6 p.m.
📍 Kimberly’s Event Center, 1029 8th Ave.
Stop by to meet the project team, ask questions and learn about current and upcoming work downtown. The event is free and open to the public. No RSVP is required.
Major infras
tructure improvements are underway, and we want to keep you informed about what’s happening now and what’s coming next. Join the City of Greeley for a Downtown Revitalization Project Open House to learn more about the Downtown Infrastructure Improvements and 12th Street Storm Drain Outfall Project.📅 Thursday, Sept. 24
⏰ 5:30-7 p.m. | Brief presentation at 6 p.m.
📍 Kimberly’s Event Center, 1029 8th Ave.
Stop by to meet the project team, ask questions and learn about current and upcoming work downtown. The event is free and open to the public. No RSVP is required.
-
Intersection Closure (8th Avenue & 10th Street) Set for September 1
Share Intersection Closure (8th Avenue & 10th Street) Set for September 1 on Facebook Share Intersection Closure (8th Avenue & 10th Street) Set for September 1 on X (formerly Twitter) Share Intersection Closure (8th Avenue & 10th Street) Set for September 1 on Linkedin Email Intersection Closure (8th Avenue & 10th Street) Set for September 1 link
Beginning Tuesday, September 1, the intersection of 8th Avenue and 10th Street will close for several weeks while crews complete water and sewer work. The intersection may reopen at times as work allows, but lane closures may remain in place.Work will also take place north and south of 10th Street, and traffic routes may change during construction.
Please use posted detours:
- From the south: 13th Street to 11th Avenue
- From the north: 5th Street to 11th Avenue
Businesses, sidewalks, pedestrian access and parking lots will remain open. Some on-street parking near the intersection may be unavailable.
Read the entire news release.
Beginning Tuesday, September 1, the intersection of 8th Avenue and 10th Street will close for several weeks while crews complete water and sewer work. The intersection may reopen at times as work allows, but lane closures may remain in place.Work will also take place north and south of 10th Street, and traffic routes may change during construction.
Please use posted detours:
- From the south: 13th Street to 11th Avenue
- From the north: 5th Street to 11th Avenue
Businesses, sidewalks, pedestrian access and parking lots will remain open. Some on-street parking near the intersection may be unavailable.
Read the entire news release. -
Missed the Groundbreaking Ceremony? Watch it here!
Share Missed the Groundbreaking Ceremony? Watch it here! on Facebook Share Missed the Groundbreaking Ceremony? Watch it here! on X (formerly Twitter) Share Missed the Groundbreaking Ceremony? Watch it here! on Linkedin Email Missed the Groundbreaking Ceremony? Watch it here! link -
Intersection Closure Set for Monday, August 17
Share Intersection Closure Set for Monday, August 17 on Facebook Share Intersection Closure Set for Monday, August 17 on X (formerly Twitter) Share Intersection Closure Set for Monday, August 17 on Linkedin Email Intersection Closure Set for Monday, August 17 link
Beginning on Monday, August 17, the intersection of 7th Avenue and 10th Street will fully close while crews install new underground water and sewer lines.Drivers should follow posted detours using 6th Avenue and 8th Avenue and plan for temporary on-street parking closures nearby. Businesses, sidewalks and pedestrian access will remain open throughout construction.What to Expect
- Drivers should follow posted detours on 6th Avenue and 8th Avenue.
- Temporary street parking closures will be in place near the intersection on 7th Avenue and 10th Street.
- Businesses, sidewalks, and pedestrian access will remain open during construction.
- Greeley-Evans Transit Route 4 will be affected by the detour. Riders should check route schedules for updates.
You can find project photos, parking information, and detour maps on the Project Dashboard.
Beginning on Monday, August 17, the intersection of 7th Avenue and 10th Street will fully close while crews install new underground water and sewer lines.Drivers should follow posted detours using 6th Avenue and 8th Avenue and plan for temporary on-street parking closures nearby. Businesses, sidewalks and pedestrian access will remain open throughout construction.What to Expect
- Drivers should follow posted detours on 6th Avenue and 8th Avenue.
- Temporary street parking closures will be in place near the intersection on 7th Avenue and 10th Street.
- Businesses, sidewalks, and pedestrian access will remain open during construction.
- Greeley-Evans Transit Route 4 will be affected by the detour. Riders should check route schedules for updates.
You can find project photos, parking information, and detour maps on the Project Dashboard.
-
It's Official! Groundbreaking Ceremony Signals Start of Project
Share It's Official! Groundbreaking Ceremony Signals Start of Project on Facebook Share It's Official! Groundbreaking Ceremony Signals Start of Project on X (formerly Twitter) Share It's Official! Groundbreaking Ceremony Signals Start of Project on Linkedin Email It's Official! Groundbreaking Ceremony Signals Start of Project linkCity leaders, project partners, downtown businesses and community members gathered Tuesday morning to mark the official start of Greeley’s Downtown Infrastructure Improvements Project, a major milestone in the City’s Downtown Revitalization Program. The multi-year project will replace aging water, sewer and stormwater infrastructure beneath downtown, much of which is more than 100 years old, to reduce flood risk, improve public safety and support future roadway, streetscape and mobility improvements.
“A stronger downtown infrastructure system benefits more than one neighborhood,” said Mayor Pro-Tem Melissa McDonald. “It protects public and private investment, supports local businesses, improves access, and helps ensure downtown remains a safe, active, and welcoming center of our city.”
Construction is underway along 7th Avenue between 9th and 10th streets, the first phase of nearly 20 blocks of planned improvements throughout downtown Greeley.
Read more about the groundbreaking ceremony.



City leaders, project partners, downtown businesses and community members gathered Tuesday morning to mark the official start of Greeley’s Downtown Infrastructure Improvements Project, a major milestone in the City’s Downtown Revitalization Program. The multi-year project will replace aging water, sewer and stormwater infrastructure beneath downtown, much of which is more than 100 years old, to reduce flood risk, improve public safety and support future roadway, streetscape and mobility improvements.
“A stronger downtown infrastructure system benefits more than one neighborhood,” said Mayor Pro-Tem Melissa McDonald. “It protects public and private investment, supports local businesses, improves access, and helps ensure downtown remains a safe, active, and welcoming center of our city.”
Construction is underway along 7th Avenue between 9th and 10th streets, the first phase of nearly 20 blocks of planned improvements throughout downtown Greeley.
Read more about the groundbreaking ceremony.



-
Infrastructure Project (and Big Boy) Picking Up Steam!
Share Infrastructure Project (and Big Boy) Picking Up Steam! on Facebook Share Infrastructure Project (and Big Boy) Picking Up Steam! on X (formerly Twitter) Share Infrastructure Project (and Big Boy) Picking Up Steam! on Linkedin Email Infrastructure Project (and Big Boy) Picking Up Steam! link
Big Boy No. 4014 rolled into Greeley this afternoon, bringing plenty of steam, whistles and excitement to the 10th Street crossing near the Colorado Model Railroad Museum.City of Greeley staff were on site with a booth to share information about the Downtown Infrastructure Improvements Project, which begins July 30. While many visitors came from out of town to see Union Pacific’s legendary steam locomotive, several Greeley residents stopped by to learn more about upcoming improvements downtown and ask questions about what to expect during construction.
Thanks to everyone who visited with us today — whether you came for Big Boy, the project information or both!
Big Boy No. 4014 rolled into Greeley this afternoon, bringing plenty of steam, whistles and excitement to the 10th Street crossing near the Colorado Model Railroad Museum.City of Greeley staff were on site with a booth to share information about the Downtown Infrastructure Improvements Project, which begins July 30. While many visitors came from out of town to see Union Pacific’s legendary steam locomotive, several Greeley residents stopped by to learn more about upcoming improvements downtown and ask questions about what to expect during construction.
Thanks to everyone who visited with us today — whether you came for Big Boy, the project information or both!
-
Join Us on August 4 for Groundbreaking Ceremony
Share Join Us on August 4 for Groundbreaking Ceremony on Facebook Share Join Us on August 4 for Groundbreaking Ceremony on X (formerly Twitter) Share Join Us on August 4 for Groundbreaking Ceremony on Linkedin Email Join Us on August 4 for Groundbreaking Ceremony link

-
Get the Latest Updates in Project Dashboard
Share Get the Latest Updates in Project Dashboard on Facebook Share Get the Latest Updates in Project Dashboard on X (formerly Twitter) Share Get the Latest Updates in Project Dashboard on Linkedin Email Get the Latest Updates in Project Dashboard link
The City of Greeley has launched a new project dashboard on the Downtown Infrastructure Speak Up Greeley page, giving residents and downtown businesses one easy place to find the latest project information.Just click on the Project Dashboard button and you'll be directed to a single site with construction updates and a preview of what’s coming next as improvements continue downtown.
Residents can also use the dashboard to plan visits to downtown Greeley. Current roadway detours and an updated parking map are available to help drivers, pedestrians, customers, and business owners navigate the area as construction progresses. The dashboard will continue to be updated throughout the project.
The dashboard also provides a closer look at project progress, including a pipe-tracking system that shows how much pipe is being replaced by type. A graphic showing current construction project spending is also available. These tools are part of the City’s ongoing commitment to transparent, timely communication with residents and downtown business owners.
The City of Greeley has launched a new project dashboard on the Downtown Infrastructure Speak Up Greeley page, giving residents and downtown businesses one easy place to find the latest project information.Just click on the Project Dashboard button and you'll be directed to a single site with construction updates and a preview of what’s coming next as improvements continue downtown.
Residents can also use the dashboard to plan visits to downtown Greeley. Current roadway detours and an updated parking map are available to help drivers, pedestrians, customers, and business owners navigate the area as construction progresses. The dashboard will continue to be updated throughout the project.
The dashboard also provides a closer look at project progress, including a pipe-tracking system that shows how much pipe is being replaced by type. A graphic showing current construction project spending is also available. These tools are part of the City’s ongoing commitment to transparent, timely communication with residents and downtown business owners.
-
Residents Learn About Infrastructure Project at Open House
Share Residents Learn About Infrastructure Project at Open House on Facebook Share Residents Learn About Infrastructure Project at Open House on X (formerly Twitter) Share Residents Learn About Infrastructure Project at Open House on Linkedin Email Residents Learn About Infrastructure Project at Open House link

Overview
The City of Greeley hosted a public open house on June 22 at the Greeley Recreation Center to share information about the upcoming infrastructure improvement project. The event was set up in an informal, walk-through format with informational boards positioned throughout the room, allowing attendees to move at their own pace and engage directly with project team members.
In addition to the project boards, a business support table was available to connect nearby business owners with resources and assistance related to construction impacts.
Handouts provided information about water utility improvements and the Civic Center Campus, giving attendees additional context on related City initiatives.
The event was marketed through social media, the SpeakUp Greeley project page and other City channels, including newsletters, to encourage community awareness and attendance.
Nearly 30 people attended, the majority of whom were project team members and partner agencies. About 12 attendees represented the public, including nearby residents and business owners who came out with genuine interest in the project.
Public Sentiment
Overall public sentiment toward the project was positive, with attendees expressing support for the upgrades the project will bring to the area. Some attendees raised concerns about parking and potential impacts to nearby businesses during construction. Attendees were pleased to learn that detour maps, parking impacts and other project updates will be posted to SpeakUp Greeley, which will serve as the central hub for all project information.
Another concern raised was the potential impact to businesses during the upcoming holiday season. The project team was able to share that this feedback had already been heard and incorporated, and that work has been phased to avoid impacting businesses during that critical period.
One comment expressed general frustration with construction activity in Greeley overall rather than concerns specific to this project. Aside from that comment, feedback was supportive of the project and its goals.


Overview
The City of Greeley hosted a public open house on June 22 at the Greeley Recreation Center to share information about the upcoming infrastructure improvement project. The event was set up in an informal, walk-through format with informational boards positioned throughout the room, allowing attendees to move at their own pace and engage directly with project team members.
In addition to the project boards, a business support table was available to connect nearby business owners with resources and assistance related to construction impacts.
Handouts provided information about water utility improvements and the Civic Center Campus, giving attendees additional context on related City initiatives.
The event was marketed through social media, the SpeakUp Greeley project page and other City channels, including newsletters, to encourage community awareness and attendance.
Nearly 30 people attended, the majority of whom were project team members and partner agencies. About 12 attendees represented the public, including nearby residents and business owners who came out with genuine interest in the project.
Public Sentiment
Overall public sentiment toward the project was positive, with attendees expressing support for the upgrades the project will bring to the area. Some attendees raised concerns about parking and potential impacts to nearby businesses during construction. Attendees were pleased to learn that detour maps, parking impacts and other project updates will be posted to SpeakUp Greeley, which will serve as the central hub for all project information.
Another concern raised was the potential impact to businesses during the upcoming holiday season. The project team was able to share that this feedback had already been heard and incorporated, and that work has been phased to avoid impacting businesses during that critical period.
One comment expressed general frustration with construction activity in Greeley overall rather than concerns specific to this project. Aside from that comment, feedback was supportive of the project and its goals.
-
AP
Phone 970-573-7811 Email Adam.Prior@greeleygov.com
-
September 24 2026
-
September 21 2026
-
September 01 2026
-
August 04 2026
-
June 22 2026
-
Planning & Design (Completed)
Downtown Infrastructure is currently at this stage- Project priorities identified.
- Utility assessments, engineering analysis and stakeholder coordination completed.
- Project phasing developed to maintain access and minimize impacts.
-
Final Design (Current Phase)
this is an upcoming stage for Downtown Infrastructure- The project is currently at 90% design.
- Final construction plans, permitting and agency coordination are underway.
-
Final Construction (Summer 2026)
this is an upcoming stage for Downtown Infrastructure- Construction will begin in phases throughout downtown Greeley.
- Infrastructure improvements will be coordinated to maintain access and minimize impacts whenever possible.
-
Future Phases (Beyond 2028)
this is an upcoming stage for Downtown Infrastructure- Additional infrastructure improvements are anticipated as part of the City’s long-term revitalization and resiliency efforts.
- Future phases will continue supporting a more connected, vibrant and resilient downtown.
-
Approach to Improving Downtown Infrastructure (199 KB) (jpg)
-
Overview Map of Infrastructure Improvements (170 KB) (jpg)
-
What Improvements Are Included (93.5 KB) (jpg)
-
Why Are These Improvements Needed (107 KB) (jpg)
-
What is Planned for July and August 2026 (162 KB) (jpg)
-
What Is Planned from August to November 2026 (166 KB) (jpg)
-
Traffic Impact from 10th Street Detour (158 KB) (jpg)
-
Traffic Impact from 8th Avenue Intersection Closure (157 KB) (jpg)
-
How to Stay Informed and Connected (104 KB) (jpg)